Recent Posts
The 1-Week Unique
Posted on 10/30/24 10:19 AM
Years in the making, Interpower® rolled out its 1-week U.S. lead times for power cords in 2008. To those acquainted with power cords, 1-week lead times may not sound that impressive. However, industry professionals know that countries and continents have their own worldwide plug patterns. Though much more standardized today, amperage and voltage ratings may vary from continent to continent, country to country. And plug bridges contain blades and pins which vary in dimensions and configurations per each country’s standard.
Topics: power cord, made to order, 1-week lead-time, molding
Made-to-Order Assemblies
Posted on 4/25/22 3:04 PM
A made-to-order (MTO) assembly is a product created per customer specifications, whereas a stock item is manufactured from predetermined specifications and placed in inventory.
Topics: made to order, MTO, special orders, cable made to order, power cord made to order
Creating Made-to-Order Assemblies
Posted on 7/29/19 12:30 PM
Made-to-order assembly: product created per a customer’s specifications. Stock item: product specifications predetermined and found in inventory.
Topics: made to order, MTO, special orders, cable made to order, power cord made to order